Trust only innovation
 
 
Algoma Steel

- Blast Furnace hanger with 120 tons crane, 22m portal frame to allow the passage of train
  torpedo cars and Locomotive to run underneath the furnace.
- Bridge for 60 ton trucks to go inside the furnace first floor (suspended concrete slab on
  steel beams).
- Heat shield covering the structure to resist the heat emitted from the loaded Torpedo cars.
- Repairs for the existing steel structures. (Sault Ste. Marie, Canada)

 

Copyright to Innovative Co., © All Rights Reserved
Designed & Developed by: